杜绝隐患需要用正确的方法安装玻璃感应自动门

来源: 日期:2019-12-07 发布人:admin
  感应自动门使我们日常生活中常见的门窗种类,尤其在办公场地或者大楼入口更是常见,网络上关于感应门的事故也是不少,那如何杜绝安全隐患,防范出现故障呢?正确安装玻璃感应自动门就可以了。
澳门太阳娱乐网站-澳门大阳城娱乐登入
  Induction automatic doors make the common types of doors and windows in our daily life, especially in the office space or building entrance. There are many accidents about induction doors on the network, so how to eliminate potential safety hazards and prevent failures? It's OK to install the glass sensing automatic door correctly.
  1、抄平划线
  1. Leveling and marking
  水准仪抄平、线坠吊垂直,先弹出地导轨滑槽控制边线,再弹出横梁安装中心线和标高控制线。
  Level gauge shall be leveled and plumb crane shall be vertical. First, the control sideline of ground rail chute shall be snapped, and then the installation center line and elevation control line of cross beam shall be snapped.
  2、地导轨安装
  2. Installation of ground guide rail
  撬出欲装轨道位置的预埋木枋条,按事先弹好的轨道滑槽控制墨线进行剔凿修整,满足安装要求后埋设安装下轨道,注意下轨道总长度应为开启门宽度的2倍+100mm。并注意下轨道顶标高应与地坪面层标高一致或略低3mm以内。
  Pry out the embedded wooden brace at the position where the track is to be installed, chisel and trim it according to the control ink line of the track chute snapped in advance, bury and install the lower track after meeting the installation requirements, and note that the total length of the lower track shall be 2 times of the width of the open door + 100mm. It should be noted that the top elevation of the lower track should be the same as the elevation of the floor surface or within 3mm lower.
  3、钢横梁安装
  3. Installation of steel beam
  自动门钢横梁一般常用[16——[22规格的槽钢加工制作,两端焊接固定在门洞两侧的钢筋混凝土门柱或墙的预埋铁件上,预埋件厚度常选δ=8——10mm为宜。
  Automatic door steel crossbeam is generally made of channel steel of [16 - [22 Specification], both ends are welded and fixed on the embedded iron parts of reinforced concrete door posts or walls on both sides of the door opening, and the thickness of the embedded parts is usually δ = 8-10 mm.
  安装时按事先弹好的标高控制线和钢横梁中心位置线进行对位,并特别注意用水平尺复核水平度后进行对称施焊。
  During installation, align according to the elevation control line snapped in advance and the center position line of the steel beam, and pay special attention to check the levelness with a level ruler before symmetrical welding.
  4、机箱安装
  4. Chassis installation
  换开关操作,调整开门的方向和速度。
  Change the switch operation, adjust the direction and speed of the door opening.
  最后安装感应探头,将传感器打开并安装好之后,再调整探头。注意调整合适的角度,不能触到天线。自动门传动控制机箱及自控探测装置都固定安装在钢横梁上,其固定连接方式有钢横梁打孔穿螺栓固定方式和钢横梁上焊接连接板再连接固定的方式。应注意钢横梁上钻孔或焊接连接板应在钢横梁安装前完成。
  Finally, install the sensing probe, open and install the sensor, and then adjust the probe. Pay attention to adjust the proper angle, and do not touch the antenna. The automatic door drive control box and automatic detection device are fixed on the steel beam, and the fixed connection mode includes the steel beam drilling and bolt fixing mode and the steel beam welding connecting plate re connecting and fixing mode. It should be noted that the drilling or welding of connecting plates on the steel beam should be completed before the installation of the steel beam.
  5、装门扇
  5. Door leaf installation
  先检查轨道顺直、平滑,不顺滑处用磨光机打磨平滑后安装滑动门扇。滑动门扇尽头应装弹性限位材料。要求门扇滑动平稳、顺畅。
  First, check that the track is straight and smooth, and then install the sliding door leaf after the smooth part is polished by the grinder. Elastic limit material shall be installed at the end of sliding door leaf. The door leaf shall slide smoothly.
  6、调试
  6, debugging
  接通电源,调整微波传感器的探测角度和反应灵敏度,使其达到最佳工作状态。
  Turn on the power supply, adjust the detection angle and response sensitivity of the microwave sensor to achieve the best working condition.
  安装感应门注意事项有哪些
  What are the precautions for installing the responsive door
  一:先安装铝合金机闸横梁,安装时一定要保持水平,否则安装完成后工作力道会产生不均匀受力的情况,磨损情况会加剧。
  First, install the aluminum alloy gate crossbeam first, and keep it horizontal during installation, otherwise, the working force track will generate uneven stress after installation, and the wear will be intensified.
  二:用门体吊挂螺栓组件将门体吊挂安装好,注意将滑轮的中心位置与门体保持平行。
  II. Use the door body hanging bolt assembly to install the door body, and pay attention to keep the center position of the pulley parallel to the door body.
  三:将限位装置安装在动力梁的导轨上,通过调节限位器螺栓调整位置。
  III. install the limit device on the guide rail of the power beam, and adjust the position by adjusting the bolt of the limit device.
  四:门体安装完成后,要调整门体高度和缝隙位置,调节吊架固定螺母,确保门体行走和移动时,无滞重现象或摩擦的声音。
  IV. after the installation of the door body, the height and gap position of the door body shall be adjusted, and the fixing nuts of the hanger shall be adjusted to ensure that there is no stagnation or friction sound when the door body moves.
  五:调整皮带张力,拉伸时皮带要保持紧绷状态,将所有压板螺栓紧固。
  V: adjust the belt tension, keep the belt tight when stretching, and fasten all pressing plate bolts.
  六:安装地轮时门体的上下缝隙要保持一致。
  VI: the upper and lower gaps of the door body shall be consistent when installing the ground wheel.
  七:如果控制系统不能顺利工作,需要进行调整。先手动检测门体,然后切
  VII. If the control system fails to work smoothly, it needs to be adjusted. First, check the door body manually, and then cut
  八:整个门体安装好了,接通电源运行检测。
  Eight: the whole door body is installed, and the power supply is connected for operation detection.
  如何安装感应门 安装感应门注意事项有哪些
  How to install the sensing door? What are the precautions for installing the sensing door
  以上就是如何安装感应门以及安装感应门注意事项有哪些的全部内容了,在此小编温馨提醒感应门在日常使用中我们还是要多注意的一些事项,谨记“一看二停三通过”,减少感应门引发的安全事故。
  The above is how to install the sensing door and what are the precautions for installing the sensing door. Here, I'd like to make a warm reminder that we should pay more attention to some matters in daily use of the sensing door, keeping in mind "one look, two stops and three passes", so as to reduce the safety accidents caused by the sensing door.